Understanding the 7 RIBA Stages: A Confident & Complete Guide

Navigating a construction project can feel complex, whether you’re a homeowner planning an extension or a developer delivering a large commercial scheme. The RIBA Plan of Work provides a clear, structured roadmap for taking a project from the initial idea through to completion and ongoing use.

At ACA, we follow the RIBA framework not only to ensure clarity and consistency, but also to embed our core values: enhancing user wellbeing, creating sustainable buildings and designing spaces that positively impact the people who use them every day.

Below is a breakdown of the key RIBA stages and how ACA integrates its approach throughout the process.

RIBA plan of work

RIBA Stage 0–1: Strategic Definition & Preparation

At the outset, we work with clients to establish the project vision, understand requirements and explore key opportunities or constraints. This is where important decisions about project scope, feasibility and sustainability targets begin.

How ACA supports wellbeing & sustainability:

– Early discussions about daylight, biophilic design, air quality, and inclusive access.

– Sustainability ambitions embedded from the start, including materials choices and whole-life carbon considerations.

– Collaboration with stakeholders to identify the health and wellbeing needs of future users.

RIBA Stage 2: Concept Design

RIBA Plan of work

This is where ideas start to take shape. We develop initial layouts, massing studies and design options to explore how the building could look and function.

How ACA adds value here:

– Designing with the user experience at the forefront, ensuring comfort, natural light and ventilation are prioritised.

– Using early-stage environmental analysis to guide decisions that reduce energy use and enhance sustainability.

– Considering how the building can promote wellbeing through spatial quality, accessibility and intuitive design.

RIBA Stage 3: Spatial Coordination

Designs become more refined and coordinated. Plans, sections, materials and key building systems begin to align, ensuring the emerging design is technically viable.

ACA’s approach at Stage 3:

– Coordination with consultants to integrate efficient heating, cooling and ventilation strategies that support occupant health.

– Selecting materials with low environmental impact and high durability to enhance long-term sustainability.

– Ensuring layouts promote intuitive movement, reduce stress factors and enhance comfort for occupants.

RIBA Stage 4: Technical Design

At this stage the design becomes fully detailed and ready for construction. Specifications, technical drawings and schedules are finalised.

How ACA embed wellbeing & sustainability in technical decisions:

– Specification of sustainable, responsibly sourced materials.

– Detailing to maximise thermal performance and airtightness for healthier internal environments.

– Ensuring building systems contribute to energy efficiency and long-term operational wellbeing.

RIBA Stage 5: Construction

RIBA Plan of Work site visit

The design becomes a reality. ACA supports the process through site inspections, coordination and ongoing communication with contractors.

Our role during construction:

– Monitoring quality to ensure the finished building meets sustainability and wellbeing ambitions.

– Ensuring the correct installation of systems that support air quality, comfort and energy performance.

– Maintaining strong communication between all parties to keep the project on track.

RIBA Stage 6: Handover

As the building is completed, ACA ensures that everything functions as intended and clients have full support and documentation.

How we enhance the handover experience:

– Ensuring building systems are commissioned for optimal performance.

– Providing clear guidance to clients on maintaining a healthy and efficient building.

– Post-occupancy input to evaluate comfort, usability and environmental performance.

RIBA Stage 7: In Use

Buildings evolve over time, and ACA stays connected to ensure clients get the most from their investment.

Our ongoing commitment:

– Post-occupancy evaluation to understand how the building performs in real-world use.

– Suggestions for future upgrades that support energy efficiency, comfort and wider sustainability goals.

– A long-term partnership mindset that prioritises user wellbeing well beyond completion.

Why ACA’s Approach Matters

By combining the structured clarity of the RIBA Plan of Work with a deep commitment to wellbeing, sustainability and client-centred design, ACA delivers spaces that are not only functional and beautiful, but also environmentally responsible and deeply supportive of the people who use them.

Keep up to date with ACA News!

Frequently Asked Questions

What is the RIBA plan of work?

The RIBA Plan of Work is the UK’s recognised framework for managing construction projects from the earliest strategic decisions through to building occupation and ongoing use. By dividing a project into 7 clearly defined stages, the RIBA Plan of Work helps clients, architects and contractors understand what happens at each point in both the design and construction process. Projects can be delivered more efficiently, with clear responsibilities, improved communication and better decision making, by following this structured approach

What happens during RIBA stage 1?

This stage focuses on preparing the project for design. During Stage 1, the client’s objectives, budget, programme and project requirements are developed into a clear brief. Architects assess site constraints and opportunities, explore feasibility, identify planning considerations and establish the foundations for a successful project before design work even begins.

What is a feasibility study?

Before detailed design begins, a feasibility study assesses whether a proposed project is practical, achievable and financially viable. Typically, it considers site constraints, planning policy, access budget, technical requirements and potential risks. Carrying out a feasibility study early helps clients make informed decisions and can prevent costly issues later in the project.

When should I appoint an architect?

The overall success of a project can be improved by seeking early advice to help identify site constraints, establish realistic budgets and reduce planning risks before significant decisions have been made. The earlier an architect is involved, the greater the opportunity to add value.

What does an architect do during construction?

Long after the drawings have been completed, an architect’s role does not stop there. During construction architects complete site inspections, respond to technical queries, coordinate with consultants and contractors and help ensure the project is being delivered in accordance with the approved design. Architects help maintain quality, minimise risks and support successful project outcomes by remaining actively involved throughout the construction phase.

Why hire an architect?

An architect combines creativity, technical knowledge and practical experience to deliver buildings that are functional, compliant and tailored to the client’s needs. Architects coordinate consultants, manage technical information, navigate planning and Building Regulations and help reduce risks throughout the project even after the design is fully developed. With their expertise, ideas are transformed into buildings that can be successfully delivered.

Related Resources

– ACA Delighted to Join the RIBA Student Mentoring Programme: Empowering Future Architects

– Proud Mentor: Alex Caruso Appointed to Prestigious RIBA Future Architects Programme for 2025/26

– ACA Celebrates Kornel’s Architect Qualification

– ACA Welcomes Work Experience Students

Share this news